Compare Hardware

Compare the details. Find your fit.

2 products

Side-by-side comparison

AI insights

Buyer advice

Preparing AI insights

Overview
Price

$215.00

From $250.00

AvailabilityIn stockIn stock
CockpitSquare overviewA physical A32X landing-gear lever assembly with separate UP and DOWN microswitches, included backlighting, and an illuminated red arrow. It is intended for connection to the SKALARKI ABRK Panel or another compatible I/O system; a controller is not included.A physical Airbus A320 402VU pedestal panel representing landing-gear and brake-fan controls. It is sold with an optional controller box and has a stated production lead time of 10–15 days.
Aircraft
A320
A320
Aviation category
Airliners
Airliners
Compatibility & connections
Supported simulatorsNot specifiedMicrosoft Flight Simulator: MSFS 2020 and MSFS 2024 via JS-Connect
ConnectionsNot specifiedNot specified
Software requirementsNot specifiedJS-Connect: Required for the documented MSFS integration; version and exact product dependency not stated on the product page
Physical requirementsController: Required; controller not includedController box: Optional; product page offers no controller box or an added controller box for +30
Hardware compatibilitySKALARKI ABRK Panel: Designed to work with the SKALARKI ABRK Panel Other I/O system: Can be connected to another I/O systemMIP Controller Box: Explicitly listed as the controller associated with the 402VU Panel
Simulator add-on compatibilityNot specifiedNot specified
Dimensions & details
Product dimensionsNot specifiedNot specified
Product weightNot specifiedNot specified
Additional factual detailsConstruction: Steel lever with bearing guides Switching: Two separate microswitches for UP and DOWN positions Backlight options: AMBER or WARM WHITE Illumination: Illuminated red arrow; controlled through software from the ABRK Panel Included hardware: Fixing screws and a 6-pin flat cable SKU: 032X-1009.A Availability: In StockSKU: PD-14 Product category: Airbus A320 - Pedestal Components Price range: 250.00$–6,600.00$ Production lead time: 10–15 days