Compare Hardware
Compare the details. Find your fit.
2 productsSide-by-side comparison |
|---|
AI insights
| Buyer advice | Preparing AI insights | |
|---|---|---|
| Overview | ||
|---|---|---|
| Price | €399.00 | From $250.00 |
| Availability | In stock | In stock |
| CockpitSquare overview | A compact Boeing 737 landing-gear panel for home cockpit simulation setups. It includes a landing-gear lever and annunciators, plus a flaps gauge and lever, MIP light-adjustment switches, and adjustable backlighting. | A physical Airbus A320 402VU pedestal panel representing landing-gear and brake-fan controls. It is sold with an optional controller box and has a stated production lead time of 10–15 days. |
| Aircraft | 737 | A320 |
| Aviation category | Airliners | Airliners |
| Compatibility & connections | ||
| Supported simulators | Not specified | Microsoft Flight Simulator: MSFS 2020 and MSFS 2024 via JS-Connect |
| Connections | Not specified | Not specified |
| Software requirements | Not specified | JS-Connect: Required for the documented MSFS integration; version and exact product dependency not stated on the product page |
| Physical requirements | Not specified | Controller box: Optional; product page offers no controller box or an added controller box for +30 |
| Hardware compatibility | Not specified | MIP Controller Box: Explicitly listed as the controller associated with the 402VU Panel |
| Simulator add-on compatibility | Not specified | Not specified |
| Dimensions & details | ||
| Product dimensions | Dimensions: 330mm x 220mm x 150mm | Not specified |
| Product weight | Not specified | Not specified |
| Additional factual details | Included controls and indicators: Landing gear annunciators, flaps gauge, flaps lever, and MIP light-adjustment switches Backlighting: Adjustable backlight Front panel material: 3mm plexiglass Casing material: 2mm aluminum Delivery time: Maximum 4 weeks Listed price: €399.00 | SKU: PD-14 Product category: Airbus A320 - Pedestal Components Price range: 250.00$–6,600.00$ Production lead time: 10–15 days |
