Compare Hardware

Compare the details. Find your fit.

2 products

Side-by-side comparison

AI insights

Buyer advice

Preparing AI insights

Overview
Price

€214.00

From $250.00

AvailabilityNot specifiedIn stock
CockpitSquare overviewA metal, 1:1-scale landing gear lever for a Boeing 737-style flight simulator main instrument panel. It includes switches for DN, UP, and OFF positions, with wiring preparation for integration into an MIP.A physical Airbus A320 402VU pedestal panel representing landing-gear and brake-fan controls. It is sold with an optional controller box and has a stated production lead time of 10–15 days.
Aircraft
737
A320
Aviation category
Airliners
Airliners
Compatibility & connections
Supported simulatorsNot specifiedMicrosoft Flight Simulator: MSFS 2020 and MSFS 2024 via JS-Connect
ConnectionsNot specifiedNot specified
Software requirementsNot specifiedJS-Connect: Required for the documented MSFS integration; version and exact product dependency not stated on the product page
Physical requirementsWiring integration: Supplied with wiring preparation for connection to the MIPController box: Optional; product page offers no controller box or an added controller box for +30
Hardware compatibilityFSC MIP: Can be integrated into the FSC MIP Upper EICAS frame: Compatible with the Upper EICAS frameMIP Controller Box: Explicitly listed as the controller associated with the 402VU Panel
Simulator add-on compatibilityNot specifiedNot specified
Dimensions & details
Product dimensionsScale: 1:1 real scaleNot specified
Product weightNot specifiedNot specified
Additional factual detailsConstruction: Aluminum construction with electrical/electronic materials Included controls: Two gear-position switches are included Lever positions: DN, UP, and OFF Mechanism: Spring-regulated extraction mechanism with adjustable pressure Knob and markings: Transparent resin knob with engraved landing-gear markings SKU: 287586SKU: PD-14 Product category: Airbus A320 - Pedestal Components Price range: 250.00$–6,600.00$ Production lead time: 10–15 days